工程名称:斯维尔实训作业序号首层建筑面1234567组小计第2层建筑面1234组小计第3层建筑面1234组小计单位(吨)
A6A8B10B14B18B20合计第1页 共1页指标(kg/m2)部位独基过梁梁楼梯墙条基柱0.0830.0120.0590.4910.851.9740.0660.0580.0120.620.0130.0660.0580.4030.4030.072.38580.411516.74430.85450.349912.419912.426945.59280.9960.0231.2140.032.830.1440.0591.6081.254.281.2442.0992.17.705过梁梁楼梯柱0.0410.620.0120.0130.5870.0531.220.0680.0680.2350.9960.0230.7920.2351.811.2441.2140.030.2772.8290.1461.3794.631.636916.74230.86158.157227.398过梁梁楼梯柱0.0410.5740.0120.0070.5870.0531.1670.0680.0680.2350.9350.0120.7920.2351.7391.2381.2250.0120.2772.7340.1111.3794.51.636916.18020.65468.157226.6289 总计0.194.3610.2020.5287.8293.72616.83699.6197
因篇幅问题不能全部显示,请点此查看更多更全内容